This procurement began with the client's clear requirements: to configure two 20FT Apple Cabins for a vacation setting in the UAE, with the core requirement being a balance between practicality for accommodation and convenient adaptability for vacation scenarios.
During the communication phase, we worked with the client multiple times to confirm that the Apple Cabins needed to meet local climate adaptability (high temperature resistance, dust protection), and that they could be transported fully assembled to accommodate temporary setup needs at the vacation location.
During production, progress was monitored in real-time to ensure that both Apple Cabins met manufacturing standards. In the delivery phase, international logistics were coordinated, precisely connecting to the client's designated UAE vacation location, and a professional team was arranged to provide on-site guidance for installation and commissioning, ultimately completing the entire delivery process and meeting the client's immediate accommodation needs for their vacation.